The task
The task was to make a machine that can be lowered 60 meters down from a railroad track
and do maintenance tasks. This let us move the operaters from the hazardous environment into a control room.
How we solved the problem
We made an access platform that was lowered down 60 meters below the railroad tracks.
The platform was rigged with equipment from our existing subsea rental pool.
We delivered on time, and budget, and we are incredibly proud to be part of this project along with AF Decom, and we see that with our wide variety of competence, the team we are together is able to deliver solutions and systems that is at the forefront of what is technologically possible to today.
We got a wide array of inventions under our belt
Peaking your interest?
Our clever team has developed a wide range of solutions
feel free to check out our company portfolio